Showing posts with label Hardwood on Steps. Show all posts
Showing posts with label Hardwood on Steps. Show all posts

Saturday, July 20, 2013

Sand and Finish red oak installed on VCT over concrete in Dickson TN

Rob smith with Complete Construction had us do this job it took 5 days one to prep the floor one to glue the floor and three to sand and put 3 coats down.  We used the Stauf adhesive and measured for moisture before prepping and after prepping the floor.  The floor was prepped with TECs self leveling agent.  560 sq ft of #1 common red oak was installed sanded and finished with Poloplaz.  




Thursday, April 5, 2012

New Home of Hardwood Flooring.









This job was refferred to us by Drew Hendry of Silverpoint properties, His client just bought the condo and wanted their upstairs floor to match the downstairs floor. We did this in about one week 600 sq ft of hardwood install 180 sq ft of tile install including tile base and the tub surround.