3 1/4" Teak installed on a 45 angle









We installed 640 sq ft of solid Brazilian Teak in 2 days Mr. Boyd ordered the wood on Friday we dropped the wood off on Monday started installing on Wednesday and finished Thursday around 12. Notice the wood changes direction two times, once in the hallway and the other in the foyer. Mr. Boyd found us on Craigslist and took advantage of our Craigslist Special. I tried to take before and after pictures so you can get an idea of the process that would take place if you purchased flooring from Country Flooring Direct.

Brazilian Teak is especially hard approximately 3 times as hard as Red Oak. Has medium brown tones throughout the floor making it compliment almost any decor you have in your home. The Teak pictured is a mixture of red and yellow teak and is graded Select and Better, meaning the lenghts of the boards are longer and there is minimal blemishes in the finished product.

Thank you for viewing our Blog.









Sunday, June 7, 2009

Carpet and wood job done in one day

Funny story: My wife teaches this customer,s daughter. Mr. Robinson came into Country Flooring Direct to look at floors. Later on he had a parent teacher conference with Mrs. Middleton. During the meeting, my lovely wife gave a plug to the store and Mr. Robinson realized that he had already met me. We installed 30 sq yds of carpet and 140 sq ft of hardwood in one days time. If you need any trees removed Mr Robinson can help. I have his number.






Friday, June 5, 2009

Last Months Craigslist special Andiroba installed 7 sq ft





























Here is a job we just did in Hermitage TN, We did the living room dinning room foyer hall and steps. A refferal from a contractor we do a lot of work for, enjoying some Brazilian Hardwood Floors and Wholesale rates and shop at home services. The steps we did this time were made out of a stair nose and the flooring. We also have solid stair treads that we can sand and finish but this way was a lot easier for the customer. We hope you enjoy the pictures.

Thursday, June 4, 2009

Bathroom Tile Job 6/4/09







We started this job at 730 am on 6/3/09 and finished 11 am on 6/4/09. The floor was rotted so we removed a section of the plywood subfloor and replaced it and performed a minor plumbing repair to insure the leak was fixed. You may notice the carpet meets the tile flush with a nice finished edge and we always use the manufactures reccomended subfloor in this case 1/4" Durock mudded to the plywood floor. This project was completed in less than 2 days and for under $600. If you need similar work done please call 615 799 9979 enjoy the pictures Mario is in one.