Sand and Finish red oak installed on VCT over concrete in Dickson TN

Rob smith with Complete Construction had us do this job it took 5 days one to prep the floor one to glue the floor and three to sand and put 3 coats down.  We used the Stauf adhesive and measured for moisture before prepping and after prepping the floor.  The floor was prepped with TECs self leveling agent.  560 sq ft of #1 common red oak was installed sanded and finished with Poloplaz.  