Tuesday, July 31, 2012

July Specials

2 1/4″ SB WO PS 18,864

$2.69

2 1/4″ CHTR WO PS 2′-10′ 12,623
$2.49

2 1/4″ 1C WO PS 15,066
$2.29

2 1/4″ 2C WO PS 9,108
$1.99

2 1/4″ 1C WO RQ 40,176
$2.99

2 1/4″ MAV WAL PS 2′ – 10′ 9,053
$3.49

2 1/4″ SB HK PS 2′- 10′ 6,525
$2.99

2 1/4″ CHTR HK PS 2′-10′ 7,695
$3.19



3″ SB WO PS 25,680
$3.79

3″ 2C WO PS 12,924
$2.49

3″ SB WO RQ 61,656
$3.79



4″ 1C RO PS 23,440
$3.69

4″ 2C RO PS 9,296
$2.49

4″ 2C WO PS 20,368
$2.49



5′ 2C WO PS 18,960
$2.45



6″ CHTR RO RQ 2′-10′ 5,010
4.25

6″ 1C RO RQ 4,032
4.25



7″ CHTR WO PS 2′-10′ 14,525
$4.35



8″ CHTR RO PS 2′-10′ 5,760
$4.35

Tuesday, July 24, 2012

New Built home in Dickson County







Job took 3 days to install the wood and stairs 7 days to install the tile for the shower tile tub surround and floor tile.  The wood is 2 1/4 red oak #1 common hardwood floor.