Bellevue Laminate Job
1000 Sq ft of Quickstep Laminate installed in the kitchen living room hall and office. We are coming back to sand and finish the bedrooms hardwood and put carpet in the upstairs bonus room.
Wednesday, August 28, 2013
Musical Sheers Hair Salon in Bellevue TN 37221 done in VCT tile by Country Flooring Direct
This job took longer than anticipated because of a large amount of prep work to the concrete. However it was completed in 2 days and the owner Bob is very happy. He wanted to remodel his salon with a floor that would stand up against hair dyes and foot traffic. The other option was luxury tiles.
The floor had been tiled with vinyl tiles over existing glue down carpet that didnt last more than a year.
Saturday, August 3, 2013
Sand and finish white oak install for Monte Mohr Realty Trust Brentwood TN
We started this job on a Tuesday installed 800 sq ft of 2 1/4 white oak #1 common, took up existing carpeting and padding, sanded everything down flat made a custom stain to match a red oak dark sample with Jacobean and Ebony 3 coats of oil with the top coat being poloplaz. We finished this work on Saturday and are coming back Monday to finish the posts rails and shoe molding work and lay the carpet in the upstairs bedrooms.
http://www.realtor.com/realestateagents/Monte-Mobile_Brentwood_TN_68690_781899722
http://www.tennesseedreamhomes.com/
http://nashvillehardwoodflooring.wordpress.com/
Friday, July 26, 2013
Saturday, July 20, 2013
I have animals/ the people whos home we moved into had animals/ My renters had animals
Our friends Phillip and Steve over at Exit Realty called us for one of their property management clients whose tenant had a cat that urinated on the carpet. The tenant had the carpet cleaned but the smell came back when the weather got hot. So how do you address the smell?
We ripped up the carpet and pad underneath was VCT tile so the urine probably stopped there. I sprayed the tile with bleach water and that afternoon we installed new carpet and padding. Had the floor not had vinyl over top but was concrete or wood sub floor we would have kilzed the floor and probably put a layer of plastic over the old stain to completely block it from reemerging..
http://www.exitrealtydiversified.com/about/profile/1628654/#profile
http://www.exitrealtydiversified.com/about/profile/1628633/#profile
Sand and Finish red oak installed on VCT over concrete in Dickson TN
Rob smith with Complete Construction had us do this job it took 5 days one to prep the floor one to glue the floor and three to sand and put 3 coats down. We used the Stauf adhesive and measured for moisture before prepping and after prepping the floor. The floor was prepped with TECs self leveling agent. 560 sq ft of #1 common red oak was installed sanded and finished with Poloplaz.